Loaded test runs for 80097 after hot ’box troubles Uncategorized by railsistem@gmail.com - February 18, 20190 RIDDLES ‘4MT’ 2-6-4T No. 80097 was back on test at the East Lancashire Railway as 2019 got underway, having been side-lined with axlebox problems in November. The Bury Standard 4 Group loco began running-in trials following its post-restoration appearance at the ELR’s October 19-21 Autumn Steam Gala, but had to be withdrawn on November 14 when the centre axlebox on the left-hand side ran hot. History in the making as No. 80097 hauls its first preservation-era passenger trains following its33-year restoration, seen here at Irwell Vale on January 19. STEPHEN WILLETTS It was subsequently taken to the railway’s Buckley Wells workshops to have the wheels dropped for inspection of the axle journals. The offending axlebox was removed and re-metalled, while at the same time the wheels were repainted and the loco prepared for painting. On December 23, No. 80097 was back in one piece and ready for its steam test, undertaking some light engine runs that were unfortunately curtailed by a steam brake fault. Following rectification the ‘Standard Tank’ was back in action on December 30 in and around the confines of Bury Bolton Street station, but later ventured out as far as Ramsbottom. Read more in the February 2019 issue of The RM – on sale now! Enjoy more of The Railway Magazine reading every month. Click here to subscribe. Share this: Comments comments Share this: Share on X (Opens in new window) X Share on Facebook (Opens in new window) Facebook Related Share on Facebook Share Share on TwitterTweet Share on Google Plus Share Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail