Trains to remove excavated material from HS2 Euston Uncategorized by railsistem@gmail.com - November 17, 20260 There will be no need to carry up to 170,000 tons of excavated material from Euston through the streets of London, because it will loaded on to freight trains and taken to Bedfordshire. Rail minister Lord Hendy has visited the Euston site to see how rail freight is being used as engineers prepare the ground for the new HS2 station. Share this: Share on X (Opens in new window) X Share on Facebook (Opens in new window) Facebook Related Share on Facebook Share Share on TwitterTweet Share on Google Plus Share Share on Pinterest Share Share on LinkedIn Share Share on Digg Share Send email Mail